Ashdod's Ad Halom Station Gets a NIS 28 Million Rebuild
Israel Railways is widening a station that will have to absorb a million more passengers a year, after a record 72 million journeys across the network in 2025.

AI illustration, not a photo of the events.
Israel's Ministry of Transportation and Israel Railways have begun a NIS 28 million upgrade of the Ashdod Ad Halom train station, expanding the passenger hall and the entrance plaza and overhauling the station's infrastructure. The work is due to be completed in the first quarter of 2028.
The station serves Ashdod, a city on the Mediterranean coast south of Tel Aviv, and sits at Ad Halom near the city's south-eastern entrance. It reopened in 1995 and was electrified in February 2021; by 2019 it ranked eighth of Israel's 68 stations by passenger volume, with about 3.76 million travellers a year. Ashdod is also home to Israel's largest container port, which makes the corridor between the city and the centre of the country a heavily used one.
What the money buys
The passenger hall is to be expanded to roughly 215 square metres, with additional ticket gates (rendered in the statement's translation as "carousels"), inspection stations and a larger ticket counter area, all aimed at easing the flow of people entering and leaving the station. The cafeteria area is to be enlarged and given a covered outdoor section with new benches and seating.
The station is also to gain an additional protected space of about 40 square metres at its southern end, with direct and rapid access from the platforms. Protected spaces are the reinforced rooms Israeli public buildings provide as shelter from rocket and missile fragments. Alongside that, the existing infrastructure is being overhauled, including fire safety systems and electrical works, with extra restrooms added. The ministry said the upgrades are being carried out with an emphasis on the most advanced accessibility features.
Why now: a network running at record load
The upgrade is framed against demand. Approximately 72 million journeys were made on Israel Railways in 2025, which the ministry described as a record year, and demand at Ashdod Ad Halom is expected to grow by a further million passengers in the coming years.
Israel's week in five stories, every Friday
Sourced and checked by the Israel.com newsroom, with Shabbat times. Free, one-click unsubscribe.
One list, unsubscribe in a click. See our privacy policy.
That is the end point of a long climb. Israel's rail network carried around 2.5 million passengers a year in 1990 and about 69 million in 2019, on the standard published figures, across a network of some 1,511 kilometres of standard-gauge track as of 2022, with a phased electrification programme running since 2010. Growth of that speed puts the strain on stations and platforms rather than on track.
The system is not without argument about how it should be run. Ynetnews has reported that the Finance Ministry wants day-to-day train operations transferred to private contractors by 2029, with the state retaining ownership of the infrastructure, a proposal opposed by the Transport Ministry and the Histadrut labour federation.
Next story Emergency
Driver, 71, lightly hurt after car hits a store at an Ashdod shopping center
Part of a wider station programme
Ashdod Ad Halom is one of several stations being reworked. Israel Railways said it completed upgrades at Beit Yehoshua, Beit Shemesh and Rehovot over the past year and is working on Caesarea-Pardes Hanna, Beer Yaakov and others.
The Minister of Transportation and Road Safety, Brigadier General (Res.) Miri Regev, put the project in that frame: "We continue to invest in infrastructure that connects the citizens of Israel to centers of employment, education, and leisure from the center to the south. The upgrade of Ashdod Ad Halom station is part of a comprehensive vision to strengthen the railway as a transportation backbone, while improving the travel experience, increasing capacity, and preparing for growing demands."
The ministry's director general, Moshe Ben Zaken, made the operational argument: "The continuous growth in the number of train passengers requires us to undertake extensive infrastructural preparation, not just adding trains." The chairman of Israel Railways' board, Moshe Shimoni, described the work as combining infrastructure development with service improvement, and the acting chief executive, Avshalom Elmaliach, said that alongside the station upgrade the company was adding approximately 40,000 seats on trains, running longer trains and expanding operating hours.
What the announcement did not say
The statement did not give a current passenger figure for Ashdod Ad Halom, so the promised extra million is not set against a base. It did not say how services will be affected while the work is under way, or whether platforms (as opposed to the concourse) are being lengthened or widened. Nor did it break the NIS 28 million down between the passenger hall, the protected space and the infrastructure works.
More on Ashdod: Places and businesses in Ashdod · Shabbat times in Ashdod
Read next
All transport →
File photo
Security
Netanyahu tours Ashdod Navy base with Katz, says a sixth submarine has arrived

File photo
Security
Italy widens flotilla abuse probe to Katz, IDF chief Zamir and police head

Illustration
Courts & Crime
Rosh HaAyin accountant suspected of omitting NIS 60 million in share income

Illustration
Emergency
Israel cuts fuel excise tax, gasoline to fall from NIS 8.27 to NIS 7.77
Sources and further reading
Every link below was opened and checked when this page was written. Official statements are marked as such: they are the subject's own account, not an independent one.
- ReportingYnetnewsynetnews.comFinance Ministry pushes to privatize Israel Railways operations despite concerns
The open policy argument over how Israel Railways should be operated
- ReferenceWikipediaen.wikipedia.orgAshdod-Ad Halom-Metropol railway station
Location, opening, electrification and the station's 2019 ranking by passenger volume
- ReferenceWikipediaen.wikipedia.orgRail transport in Israel
Long-run ridership growth, network length and the electrification programme
- ReferenceWikipediaen.wikipedia.orgPort of Ashdod
Ashdod's role as Israel's largest container port
How we checked this
The scope, cost, timetable and all official quotations come from the Ministry of Transportation and Israel Railways announcement of 1 February 2026 reproduced in the original text, including the figure of about 72 million journeys in 2025. Background on the station, the network's growth and the privatisation debate was drawn from reference sources and Ynetnews reporting that were checked.
Our sourcing and corrections policy →
The week from Israel, in one email
The stories that mattered, sourced and checked by the Israel.com newsroom. Free, weekly, one-click unsubscribe.
One list, unsubscribe in a click. See our privacy policy.
Israel.com is free, and readers like you keep it that way.
The Israel.com newsroom checks every story against its sources and publishes it free. If this one helped, a contribution of any size keeps the next one free too.
One payment, nothing to sign up for. Another amount
Latest
- IDF fires interceptor at suspected aerial target over southern Lebanon
- Soldiers killed near Hebron named and buried as army operation goes on
- Truck driver arrested after fatal crash on Route 465 near Aboud
- IDF says about 220,000 dunams of West Bank olives harvested so far
- Troops detain Palestinian suspected of planning imminent attack in Binyamin area
- Man of about 25 shot dead in Yafia, near Nazareth, during a taxi ride